solar pump installation manual


Note that all of these are those that must be replaced on any Simple Pump system, no matter what configuration driven by hand or motor. If the pump rod drops into the pump head the only way to retrieve it will be to remove the pump head and riser tube. Note that 50psi relates to approximately110 feet of head.) Finally, tighten the pinch bolt (on right) and then the three mounting bolts. Attach it, now, to the top of the current 24 rod. 5 0 obj Keep in mind the power leads provided are 20 in length. Now is the time where a second set of hands might be helpful to deal with the added weight of the control box and to assure easier alignment of the lower linear bearing, yoke, and upper linear bearing as you slide them down onto the 3/4 rod extension. Loosen or remove the two 5/16 Allen bolts on the yoke and using a large flat blade screw driver gently spread the opening in the yoke to clear the pump rod. endobj Please ask us if you want to consider this possibility. If the batteries fail or melt down the MorningStar will isolate them from the system with its built in circuit protections. Notice that one of the ring terminals is larger in diameter than the other, 3/8 and 5/16. 645 0 obj <> endobj Do not remove the stainless steel nipple (i.e. It is critical that, in high wind conditions, the PV cannot spin around or move and break the electrical connections to the control box. Stabilize and affix the battery box to the pole using the U-Bolt as shown in the photo below. Click here to view additional details on the Simple Pump Solar Well Pump Kits. No. The 5/16 ring terminal attaches to the empty negative post of the first battery, and the 3/8 ring terminal to the empty positive post of the second battery. How freely it moves is an indication of what the motor is working against. Also keep in mind that the solar panel will be facing south and we do not want it to be shaded by any other structures, plants, trees, or even the pump itself. They may or may not apply precisely to the mounting hardware you have purchased. (It can be more frequent for industrial applications, or any application pumping water with a significantly non-neutral pH, or high particulate levels.) If the effortis any more than this,remove the pump head and try again to determine if theproblem is in the head. J*jZ6vN.nQ1q I)iU5u Z&fV.n^!a">%~N/(,*.)RS[W?08495=3;7pxv~qyu}s{wK. There is 1/4 of space between the bearing housing and the top of the rod gland when the holes are aligned. Then, if you want to charge a pressure tank, a small transfer pump can move the water from the ambient tank to the pressure tank. As long as the gear motor system is pumping correctly and not causing the motor to overload, no maintenance is required. Align the holes for the four mounting bolts with the four holes on the flat rear of the pump head. A few general tips that may be useful are: We STRONGLY RECOMMEND that a mounting pole extend a full 3 below ground level. :DO{aN~cZV.hY Z dz6)&T(J\6 /zS zp[h%hTyd]vP#.q At this point your batteries are charging and the system installation completed. We will come back to this at start up. The pump head will be removed and the 36 rod detached. In the previous section, you prepared (if applicable) an already installed hand pump for installation of the solar motor unit. The transfer pump is powered from the Simple Pump unit. hbbd``b`63a$8Kc6HD\ @&: "@}$2& ~ 2EH B/(LL 1AOgXt At this point the negative terminal of the first battery and the positive terminal of the second battery are not being used. At this voltage even the best deep cycle batteries available would be at 75% discharge and would need to be fully charged before doing any work. AGM will cost triple but will last longer. 128 degrees F, LBLD mechanism with stainless steel drive cover and electrical components cabinet, 3/4 x 36 stainless steel pump rod and 3/4 x 13 stainless steel pump rod extension, (3) 15amp ATO/ATC prong style fuses (spares), (4) 1/4-20 x 7/8 SS SHCS fasteners for mounting the LBLD to the pump hea, #6 gauge jumper cable for connecting two batteries, (4) Allen wrenches: 9/64, 3/16, 1/4, 5/16, A small crescent wrench. You have two remaining two 20 cables, starting at the Solar panel J-box and extending out of it. After loosening the pinch bolt and the 3 mounting bolts on the split flange, pull the pump head up out of the well, enough to expose the bell end of the top PVC drop pipe and a couple of inches below that. endstream endobj 646 0 obj <. endstream endobj startxref endobj Now connect these two cables at the two remaining male, female connectors on the bottom of the control box marked Panel positive and negative. Then depending on the option you have, you will: Remove the 13 rod extension to leave the 24 ready for hand operation. Or replace the 36 rod with the 24 rod. This procedure will be reversed. BE CAREFUL! This will give you time to read the Operators Manual to both the solar controller and the programmable timer. The Solar Panel has been mounted on the bracket and set to the desired sun angle as per bracket instructions. You may have chosen a different pole or roof mounting system. Turn on the power. Lower the control box over the pump rod passing the pump rod thru the lower guide bearing first, the yoke and then the upper guide bearing aligning the pump head with the four mounting holes on the adaptor plate and secure. Disconnect the 3/4 stainless rod from the topmost sucker rod. The panel bracket has been secured to the pole. During the break-in period, pump from the nozzle or unrestricted through a hose. continuous, Output Torque Maximum: 400 in/lbs. pump aquajet pro solar 9v fountain interested The pumps seals must be replaced periodically typically every 3 to 7 years. %%EOF We use cookies to try and give you a better experience in Freshdesk Support Desk. Did you find it helpful? If the pump does not run at this time you will need to set the time and day in the timer, program start and stop times, or use the manual override as per instructions. http://www.loomistank.com/bushman-tanks.shtml, Output Torque (24VDC): 195 in/lbs. The handle screws on to the pump rod in the OPPOSITE direction to regular screws and bolts you turn counter-clockwise to tighten. There are two issues that would need to be dealt with with increasing distance between the motor and the pressure tank voltage drop between the motor and the pressure switch and the resonant back-pressure wave that can arise. $.' DC motors operating in ambient temperatures above 100 degrees F lose operating efficiency the hotter the ambient temperature, the less efficient. Refer to the charge controller operations manual for additional trouble-shooting tips. snow melting systems concrete pour healthyheating Lift up the 3/4 diameter SS pump rod 2 inchesto make sure that the piston is not sitting on the ball at the bottom of the pump cylinder. When you are ready to use the water, be sure to use a drinking-water quality hose, or piping. OB xOk@}9v b;qSjHjB[JoRu\;JZvc!h:;=xd!a0`*h>SdA DO NOT LET GO OF THE PUMP ROD! Make your hole 3 feet deep, with post hole digger or by hand. Adapt as needed.). 2 0 obj JFIF C 24VDC can be obtained from the terminal block by placing the positive lead to the device on position #1 and the negative lead from the device on position #3 or #4 (with #1 being the furthest terminal position to the left and #4 being the furthest terminal position to the right as you face the terminal block with the door open). The recommended configuration is to pump into the ambient (i.e. It is equally important for the pump head seals that only the smooth continuous rod pass by the seals on each stroke. Brace with gravel/rocks as necessary to hold the pole. If you did not already, lower the riser tube so that at least 6 inches of riser tube are below the split flange on the cap. A 15 amp fuse is present and is intended to protect the control circuits only. Using the male and female connectors as your guide, push the cable extensions onto the J-box power leads. Starting with a fully-functional lever-arm pump, what follows are the step-by-step installation instructions to remove the handle assembly and install the motor. Before you lower the control box onto the pump rod and pump head; first, rotate by hand the lever arm which is attached directly to the motor shaft so it is pointing directly at the ground and parallel to the pump rod. " #/_ :P $@! K? P0p/ @HH(Hhh( A,dKG.[y)k\< You will need two 12v batteries: group 27 or 31 Deep Cycle (from almost any auto parts store), and minimum 100 amp-hour rating. Sorry we couldn't be helpful. <> If you have a 3 galvanized mounting pole (single module).mark the two .400 holes and drill with a 3/8 bit. This ends the preparation of an existing hand pump. TANKS: See the range of Bushman drinking water storage tanks, on the bottom of this page:http://www.loomistank.com/bushman-tanks.shtml. As long as the Motorized System with the LBLD is pumping correctly and not causing the motor to overload, no maintenance is required for the LBLD motor component. <>/ExtGState<>/Font<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.32 841.92] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> Configuring like this raises the overall reliability of the system. modbus meter energy solar server card mpp Now you can slide the control box into its final position. The motor normally operates in the range of 100-150 F depending on workload and ambient temperature. %PDF-1.5 If the flow rate of your pump starts to fall, replacing the seals may well be the solution. (Sakrete is convenient for this job.). It should requireabout 40 lbs. endobj Yes PUMPING INTO PRESSURE: Pumping into pressure is possible, as long as static level plus any vertical rise plus pumping into pressure is within our maximum total head (225 for the 100CA pump cylinder or 175 for the 125CA. hb```a``:A2@1Ad bvJ+pnyCEGGxGG&:xiq A0C,-lxoH9^lu-00;1d7 @\ f:&H31 e( i2 Secure it firmly on the stainless nipple. If you are installing your Simple Pump now, you will start HERE. (less than 1 mouth), Portable drill with 3/8 bit and 1/2 bit. Photo is one example, only. There is no requirement to oil any of the LDBD system components. Lead acid will be the least expensive. This puts the connecting piece between the lever arm and the yoke also parallel to the pump rod and the yoke at 90 degrees to the pump rod. If you have a 4 galvanized mounting pole (double module)mark the two .530 holes and drill with a 1/2 bit. % What you do after that will vary, depending on your needs. Transfer pumps include an integrated pressure switch. It is extremely important to replace the fuse with only a 15 amp ATO/ATC automotive style fuse. Just like the Simple Pump itself, your gear motor assembly and control box have been built giving great care to precision. Now, from either the 13 or 36 section just above Screw the handle back onto the pump rod and the handle bracket to the pump head with the four stainless steel screws. bilge pump pumps yacht replacing boat installation location water hull boats switch float wire install outlet hose yachts @ 45.9RPM @ 16.63 amps, Typical temperature of casing, operating in 72 degrees F ambient. solar address rock powered solar inground ground mil rectangle bs midwest canvas sc age space pool rectangular covers pools feet silver NOTE: Since needs for tank volume and pumping capacity will vary greatly, we do not provide the ambient tank or transfer motor. Continue with the next two pages of instructions to replace the current 24 rod with the new 36 rod. Screw the four mounting bolts (1/4-203/4 SS SHCS) through the holes just aligned, fastening the mounting plate to the pump head. If you are using a transfer motor to take water from an ambient tank to a pressure tank, you can power that motor from the Simple Pump system. The linear bearing link drive translates the rotary action of the Simple Pump 24 volt DC gear motor to move the pump rod up and down on a precision ground and polished stainless shaft guided by two linear TEFLON bearing carriers. This positions the motor drive at the very bottom of the pump stroke. For example, if cut off by snow for a week and the motor fuse blows. If it is not clear from reading Section 2 how to reverse the procedure, please contact us for assistance. The modules are grounded in the J-box by means of a green bonding wire that attaches to the aluminum frame, which is then bolted to the aluminum bracket, that is bolted to the steel pipe, which is sunk in the ground. 4 0 obj $oE ]mML~c 1Km{[[SGPVp0 w25t3t1%aabbbcdfgdccb/*$ You are ready to pump water again. When you see where the bottom of the riser tube is, lower again so that 6 inches are below the split flange. Your units instructions take precedence. Next, have a helper hold the riser tube. Your final step will be to tighten the pinch bolt and then the three mounting bolts. 1 0 obj The steel pole you purchased should be more than strong enough to hold the panel(s), provided it is installed properly. (Custom lengths are also available.). Select from the four 20 cables that came with your Solar Package the two cables with ring terminals on one end and MC4 (Solar) connectors on the other end. Then using a 5/16 Allen wrench, tighten the two stainless steel socket head cap screws on the yoke. stream endstream + c,"4cPI@50_AtJL0@2GYhB)qcPFkAsM[::[Wt^ gUewp%m|4_i(hg]o8r\$$a@ ,+,$A&Of60M|suJ?)gaYU^\e$1yF(T3zWcZYmUuWAr. Dankoff, Surflo and Jabsco. Once the solar panel was connected the batteries began to charge; by following the instructions in your Operators Manual you can now set the battery type and monitor the charge cycle by viewing the digital readout on the meter and the charge status LEDs. ff/weM=L~c+go?dojl*N/,,MMf*FV.kjbcd=pKgES_OKx{'C,)BV_oDULM^R.$,,$oX11;.iq}@4~[ K/}BpvyQ-2x@ /Dp000ppHXHHXxDx$oH 9iXYX~1#! Optionally, if you have the cover off, you can apply a bit of lubricating oil on the two points where ball bearings in the drive move during operation. DO NOT ATTACH THE SAFETY COVER AT THIS TIME. Lift the pump rod so that the rod extension joint clears the top of the lower guide bearing one inch and tighten the two 5/16 bolts on the yoke. Four guide wires or ropes at 90 degrees can help hold the pole vertical while the concrete dries. Using the 9/64 Allen wrench, remove the six screws that attach the cover. In that case, you will reverse the earlier procedure to remove the motor unit. Reinstall the pump head and riser tube.